No. Project Name Scope description Contractor End User PO Date
A. SUPPLY AC UPS, RECTIFIER/BATTERY CHARGER, INVERTER, STATIC TRANSFER SWITCH, BATTERY
 ONGOING PROJECTS
1 Bandara Kualanamu, Sumut Supply & install commercial AC UPS with battery Wijaya Karya Departemen Perhubungan 24-Feb-11
2 Bandara Kualanamu, Sumut Supply & install industrial AC UPS with battery Wijaya Karya Departemen Perhubungan 31-Jan-11
3 Bandara Kualanamu, Sumut Supply & install industrial AC UPS with battery, supply and install flywheel UPS Wijaya Karya Departemen Perhubungan 18-Agust-10
 COMPLETED PROJECTS
1 Routine Maintenance Supply VRLA battery (300Ah, 500Ah, 850Ah) Newmont Nusa Tenggara
2 Routine Maintenance Maintanance AC UPS Pertamina UP-IV Cilacap 15-Nop-10
3 Bandara Soekarno Hatta Supply & install industrial AC UPS with battery Rimbun Sekawan Utama Angkasa Pura-2 Cabang Soetta 15-Jul-10
4 LPG Panjang, Lampung Supply & install industrial AC UPS with battery Rekayasa Industri Pertamina Pemasaran 27-Apr-10
5 New BTS Supply VRLA battery Maxima Cipta Integrasi Operator telco 23-Apr-10
6 New BTS Supply VRLA battery Maxima Cipta Integrasi Operator telco 23-Feb-10
7 New BTS Supply VRLA battery Maxima Cipta Integrasi Operator telco 19-Jan-10
8 Ammonium Nitrate Plant Supply & install industrial AC UPS with battery and DC UPS with battery Rekayasa Industri Kaltim Nitrate Indonesia / Orica 13-Jan-10
9 New BTS Supply VRLA battery Maxima Cipta Integrasi Operator telco 09-Des-09
10 Supply & install inverter Guna Era Manufaktura 10-Jun-09
11 Gas distribution network project Supply & install industrial AC UPS with battery Mega Power Mandiri Perusahaan Gas Negara 08-Mei-09
12 Factory expansion Supply & install battery charger with battery Exabb Energy Nusantara Multi Bintang 07-Mei-09
13 Supply & install indstrial AC UPS with battery Bina Control Power JOB Pertamina - Talisman 27-Agust-08
14 GE Frame V Gas Fired Power Plant Expansion Project Supply & install battery charger with battery Sulzer Hickam Lontar Papyrus 25-Apr-08
15 Routine Maintenance Supply VRLA battery (1500Ah) Newmont Nusa Tenggara 10-Apr-08
16 Ningaloo Vision FPSO Project, Myanmar Supply Static Transfer Switch Areva Indonesia 04-Apr-08
17 2x50MW Keramasan Gas Fired Power Plant Supply & install battery charger with battery Wasamitra Engineering Asta Keramasan Energi 10-Mar-08
B. SUPPLY ELECTRICAL SWITCHBOARD, MCC, DISTRIBUTION PANEL, CONTROL PANEL
 COMPLETED PROJECTS
1 Gresik Oil terminal Supply & install soft starter, breaker panel dan VSD Krakatau Engineering Shell Indonesia 27-Jan-09
2 Gresik Oil terminal Supply & install switchgear, MCC, ATS, capacitor bank Krakatau Engineering Shell Indonesia 23-Sep-08
3 LOBP Surabaya Supply distribution & lighting panel Rekayasa Industri Pertamina Pemasaran 15-Nop-07
4 Bio ethanol project, Lampung Supply PLC panel Rekayasa Industri Medco Okt-07
C. SUPPLY OTHER EQUIPMENT
 COMPLETED PROJECTS
1 Yearly investment Supply mud pump (F-1000) Revindo Mandiri Elnusa 28-Sep-10
2 Routine Maintenance Maintanance smart load bank Perusahaan Gas Negara 15-Okt-09
3 Yearly investment Supply diesel genset Revindo Mandiri Pertamina EP Lirik 28-Sep-08
4 Routine Maintenance Rental compressor Newmont Nusa Tenggara 30-Apr-08
5 2x300MW Labuan Coal Fired Power Plant Supply calibrator and power supply Truba Jaya Engineering Perusahaan Listrik Negara 10-Apr-08
6 Replacement Supply & install 20kV/0.4kV power transformer 640kVA Mitra Karya Derap Maju Sep-07
D. SUPPLY DAN JASA KONSTRUKSI
 ONGOING PROJECTS
1 Bandara Kualanamu, Sumut Pekerjaan Elektrikal dan supply & install industrial AC UPS with battery Nindya - Smart JO Departemen Perhubungan 16-Nop-10
 COMPLETED PROJECTS
1 760MW Tj Priok Gas Fired Power Plant Expansion Project Supply & install 70kV seal end, 70kV DS, 70kV power cable, 70kV SS relocate Wasamitra Engineering Indonesia Power UB Tj Priok 05-Feb-09

No. Project Name Scope description Contractor End User PO Date
A. SUPPLY TRANSFER PUMPS
 ONGOING PROJECTS
1 New investment Supply water injection pump + electric motor driver complete with piping system Geo Dipa Energi 04-Feb-11
 COMPLETED PROJECTS
1 Replacement Supply centrifugal pump Manara Mas Pertamina EP Region KTI 15-Apr-11
2 Replacement Supply centrifugal pump Manara Mas Pertamina EP Region KTI 14-Apr-11
3 MFO receiving facility KCB Gear Pump & SIGMA Gear Pump Lima Elang Nusantara Globalindo PLN Nusa Tenggara Timur 14-Okt-10
4 Replacement Water dillution pump (self priming type) Kaltim Parna Industri 05-Okt-10
5 New investment Supply various size Deep Blue Centrifugal Pump + electric motor PT Pertamina EP Region Jawa 28-Jun-10
6 Gajah Baru Development Project Supply Johnson horizontal centrifugal pump ISO standard Metito Indonesia Premier Oil Indonesia 22-Apr-10
7 Re-aktivation X-ray platform Crude transfer pump with 45kW variable speed drive) Petrotech Penta Nusa Pertamina EP Region Jawa 25-Mar-10
8 Water treatment & water injection Jatibarang Supply water injection pump (50000 BPD), API 610, with electric motor (VSD duty) Citra Panji Manunggal Pertamina EP Region Jawa 23-Mar-10
9 New investment Supply Centrifugal Vertical In-Line Pump + 30kW variable speed drive Pertamina EP Region Jawa 10-Okt-09
10 Maintenance Supply Southern Cross Booster Pump CDLF 16-60 Kalimantan Mining Services (Orica) 25-Jun-09
11 Gresik Oil Terminal Supply Diesel Stroge Pump Krakatau Enginering Shell Indonesia 04-Jun-09
12 Supply Southern Cross Pump + electric motor Thiess Contractor Indonesia 03-Jun-09
13 Maintenance Service pump Kaltim Parna Industri 20-Mei-09
14 Maintenance Service pump Kaltim Parna Industri 08-Mei-09
15 Depot Benoa Supply Centrifugal Pump API 610 Baharu Penta Kencana 14-Apr-09
16 Supply Southern Cross Pump + electric motor Thiess Contractor Indonesia 07-Apr-09
17 Supply Booster Centrifugal Pump Lintas Daya, CV 24-Mar-09
18 Maintenance Supply gear Pump Brand Koshin MTU Indonesia 13-Feb-09
19 760MW Tj Priok Gas Fired Power Plant Expansion Project Supply water transfer pump Wasa Mitra Engineering Indonesia Power UB Tj Priok 16-Jan-09
20 Depot Benoa Supply Deutz Generator Set TD226 B6 Baharu Penta Kencana Pertamina Unit Pemasaran 09-Jan-09
21 Depot Benoa Supply Centrifugal Pump API 610 Baharu Penta Kencana Pertamina Unit Pemasaran 19-Sep-08
22 Gresik Oil Terminal Supply chemical (additive) injection Pump Krakatau Enginering Shell Indonesia 18-Sep-08
23 New investment Supply Centrifugal Pump for chemical cleaning Kaltim Parna Industri 22-Agust-08
24 Replacement Water dillution pump (self priming type) Kaltim Parna Industri 15-Agust-08
25 New investment Supply Centrifugal multistage Pump + DEUTZ diesel engine prime mover Pertamina EP Region Jawa 13-Jun-08
26 Maintenance Service pump Pertamina UP-V Balikpapan 01-Jun-08
27 New investment Supply Johnson transfer pump Pertamina UP-V Balikpapan 24-Mar-08
28 New investment Supply Centrifugal Pump API 610 Pertamina EP Region Jawa 31-Agust-07
29 Maintenance Supply spare part National Oil Well Elnusa Workover Services (EWS) 30-Jul-07
30 Maintenance Supply spare part Johnson Pump Menara Mas 08-Jun-07
31 Maintenance Supply Welding Power Supply, Welding transformer Jeil Fajar Indonesia 04-Jun-07
32 Replacement Supply Grindex sump pump for hot water Kaltim Parna Industri 13-Feb-07
33 Proyek Pengembangan Pondok Tengah Supply 5 unit slurry pump + diesel engine prime mover Cupuintan Pertamina EP Pengembangan Pondok Tengah 31-Jan-07
B. SUPPLY GAS ENGINE / GAS GENSET
 ONGOING PROJECTS
1 Replacement Supply 3 units Guascor Gas Generating Set SFGM 560 Pertamina EP Region KTI 30-Mei-11
 COMPLETED PROJECTS
1 New investment Supply 1 unit gas genset Guascor SFGM 560, 925kW Pertamina EP Region Jawa 17-Des-09
2 Water treatment & water injection Jatibarang Supply 3 units Guascor Gas Generating Set SFGLD 560/55 Citra Panji Manunggal Pertamina EP Region Jawa 23-Mar-10
C. SUPPLY FIRE PUMPS AND / OR DRIVER
 COMPLETED PROJECTS
1 New investment Supply fire pumps + diesel engine Pilar Bahtera Global Pertamina EP Region KTI
2 New investment Supply diesel genset fire pump Bukit Asam
3 Replacement Supply portable fire pump (CDI Tohatsu 2202/1H07) Pertamina EP Region KTI 31-Agust-10
4 Maintenance Spare part TOHATSU portable fire pump Pertamina EP Region KTI 05-Jun-09
5 Maintenance Supply Daewoo Doosan diesel fire fighting Bintang, CV 12-Feb-09
D. SUPPLY WATER TREATMENT SYSTEM
 COMPLETED PROJECTS
1 New investment Supply RO (reverse osmosis) system Manara Mas Pertamina EP Region KTI 14-Des-10
E. BOT / BOO WATER TREATMENT SYSTEM
 ONGOING PROJECTS
1 New investment BOT (Build, Operate, Transfer) re-use waste water treatment plant, 10 years contract, capacity 500 m3/day Cibubur Junction 22-Mar-10
I am a Member
I am the Administrator
I am the Webmaster
www.pilarbahteragroup.com | www.pilarbahteragroup.co.id
Rukan Mangga Dua Square Block E/5  Jalan Gunung Sahari Raya No 1 – Jakarta Indonesia  Phone : 62‐21‐62313090, 62313093, Fax : 62-21-62313331  Email :info@pilarbahteragroup.com
©2011, Version 4, Powered by Brainer® Sistem Integrator
CSS3 optimized for Safari 4 (WebKit) and Firefox 3.6a (Gecko) browsers